Fix the Varner Road Bottleneck.

Edward Boumendil will work with Cathedral City and Riverside County to pursue a traffic light or roundabout for the Varner Road bottleneck, guided by traffic data, engineering review, and a public timeline.

White and metallic red sedans lead a long line of cars, pickup trucks, and two unbranded yellow box trucks waiting on Varner Road beneath scattered white clouds, with desert hills and wind turbines in the distance
A long line of cars, pickup trucks, and two yellow box trucks queues on Varner Road.

In brief

People who use Varner Road have asked for change for years. Edward will work with Cathedral City and Riverside County to pursue a traffic light or roundabout at the evening bottleneck, with traffic engineers evaluating the safest practical choice.

The immediate concern

A recurring backup deserves a documented answer.

Traffic can stack up in one direction at a point controlled by a stop sign on Varner Road during the evening, even when opposing traffic appears light. That observation should trigger professional review rather than a predetermined engineering conclusion.

The campaign has not located current public peak-hour traffic counts, queue-length measurements, turning-movement data, or a traffic-engineering analysis focused on this particular stop. Obtaining and publishing that evidence is the responsible place to begin.

What public reporting establishes

The larger Varner Road project remains complicated.

NBC Palm Springs reported on July 8, 2026, that engineers were still completing environmental reviews, technical studies, and an additional hydrology study for the Varner Road segment between Palm Drive and Date Palm Drive. The report said final design approval and construction funding were still unresolved.

Earlier reporting described divided responsibility involving Cathedral City and unincorporated Riverside County along part of the corridor. That regional complexity does not remove Desert Hot Springs from the conversation: residents use this road every day, and their city should press for answers, coordination, and a public timeline.

Edward’s three-step plan

Measure first. Act on evidence. Report back.

01

Measure the backup

Request peak-hour traffic counts, turning movements, queue length, travel time, and collision history at the stop-controlled location.

02

Test a traffic light or roundabout

Work with Cathedral City, Riverside County, and qualified traffic engineers to evaluate the existing stop control and determine whether a traffic light or roundabout is the safest practical improvement.

03

Force coordination

Bring Desert Hot Springs, Cathedral City, Riverside County, and CVAG together around responsible agencies, funding, milestones, and public reporting.

The standard

A quick improvement and the corridor rebuild are different jobs.

A focused review of one stop-controlled bottleneck should not wait for every mile of Varner Road to be rebuilt. At the same time, no traffic control should be changed based on appearances alone. Edward’s position is to pursue a safe near-term answer while continuing to demand progress on the broader corridor.

Residents have waited long enough. Measure the backup, choose the right fix, and move it forward now. I will work with Cathedral City and Riverside County to pursue a traffic light or roundabout, require traffic counts, turning movements, queue lengths, and collision history, and ask engineers to recommend the safest practical design. Desert Hot Springs, Cathedral City, Riverside County, and CVAG must publish the responsible agency, timeline, and funding plan.

  • Publish who owns the decision and which agency is responsible for each segment.
  • Publish the traffic data and engineer’s recommendation in plain language.
  • Separate work that can be completed now from projects dependent on major construction funding.
  • Give residents a dated update even when a milestone slips.

Sources

Read the underlying material.

  1. Varner Road: Still the Valley’s Road of WoesNBC Palm Springs · July 8, 2026
  2. Safety for Some: The Jurisdictional Gridlock of Varner RoadNBC Palm Springs · February 5, 2026